Today, the members of Programming were fixing their programming cables since there were connection problems between the PC and robot. Programming was also working on a way to tune the robot and place a properly working camera on the robot. On the Electronics side of ST, members were busy forming the layout of the electronics board for the robot. CAD members were putting the in final head shafts for both the elevator and intake while Fabrication was calculating possible positions for the second robot.